Re: CONC - Stripping of Deck Forms

[Subject Prev][Subject Next][Thread Prev][Thread Next]
> The contractor wants to know if he can strip the forms after 7 days, 
assuming the concrete has reached full design strength. < 
 
How has it been confirmed that the concrete has achieved its full design 
strength?  ACI 301-2.3.4 addresses removal of forms based on design strength.  
Some engineers allow removal of forms even before full design strength has 
been reached if the element is protected from live loads.  Some responders 
have mentioned creep/ modulus of elasticity - but I believe modulus of 
elasticity is proportional to strength; thus if it has developed full design 
strength, shouldn't it also have developed its modulus of elasticity?  I don't 
see it as a problem if strength development has been documented.