Need a book? Engineering books recommendations...

Return to index: [Subject] [Thread] [Date] [Author]

Re: "re-use" fees

[Subject Prev][Subject Next][Thread Prev][Thread Next]
GRileyPE(--nospam--at)aol.com wrote:
> 
> Lately, I've been asked to bid some housing tract projects. The houses are
> approximately 2,000 to 2,500 with 3 standard plans and 3 elevations for each
> plan. The tract size ranges from 24 to 50 homes. What are typical guidelines
> for the "re-use" fee of the plan after the first three models are built? I've
> been getting a very wide divergence of opinions (so what else is new?). Any
> takes?
> 
> Greg Riley PE
> 
>.......................................................................
Greg:

Typical AoneA guidelines is 100% for the original design, 50% for the
second use and 25% for each additional use.


Donn Wooldridge RA/SE
Phoenix AZ