Section 1921.6.12 of the 1997 UBC (item 1): "Thickness shall not be 
less than 2 inches (51 mm)."

Without a topping slab, the diaphragm thickness at joints between 
adjacent double tees is zero.

These requirements have been further refined in ACI 318-99, the 1997 
NEHRP Recommended Provisions, and the 2000 IBC.

******
> Date:          Mon, 13 Dec 1999 17:49:19 -0700
> From:          Jake Watson <jwatson(--nospam--at)inconnect.com>
> Subject:       Precast Double Tees Diaphragm
> 
> Looking for help again....
> 
> 	Recently at an ICBO/ACI concrete seminer Dr. Gosh said that precast
> double tee's without a topping slab couldn't be used as a structural
> system.  I am evaluating an existing schoold with such a diaphragm. 
> Could anyone point to where in the code this system has been
> eliminated?  Also, does the UBC adopt PCI's precast book as a reference
> anywhere?  PCI addresses this issue (somewhat) but I can't find where
> the UBC will allow me to use it.
> 
> 	If all else fails, does anyone have suggestions on how to upgrade this
> system without a topping slab?  The weld plates embeded in the top
> flanges won't work if I use FEMA provisions.
> 
> Thanks in advance, 
> Jake Watson E.I.T.
> Salt Lake City, UT

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Michael Valley                                   E-mail: mtv(--nospam--at)skilling.com
Skilling Ward Magnusson Barkshire Inc.                  Tel:(206)292-1200
1301 Fifth Ave, #3200,  Seattle  WA 98101-2699          Fax:        -1201