Return to index: [Subject] [Thread] [Date] [Author]

Voc-Tech Floor Loading

[Subject Prev][Subject Next][Thread Prev][Thread Next]
What Live Load should be used for a High School Vocational Technical framed
floor? I was thinking about 150 psf but that seems a bit excessive. The
floor will occupy electrical and machine shops.Framing consists of
composite steel beams and a 5" slab on 1 1/2" composite deck. Bays are 34'
x 24'.


Thanks