Return to index: [Subject] [Thread] [Date] [Author]

RE: required live load for bank lobby

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Dan,

Lobbies are mentioned in 2 listings in the IBC and they are both 100 psf.
There is also a concentrated load of 2000 lbs for office building lobbies.

If you have any coin storage or small safe areas, the loading can get huge
in a hurry.

Regards,
Harold Sprague


> -----Original Message-----
> From:	Dan Vines [SMTP:dan(--nospam--at)willettengineering.com]
> Sent:	Wednesday, February 16, 2000 11:27 AM
> To:	SEAINT (E-mail)
> Subject:	required live load for bank lobby
> 
> Has anyone seen specifically in any code the required live load for a
> banking floor?
>  
> Thanks
> Dan
>  
> Sherman D. (Dan) Vines, EIT
> Willett Engineering Co., Inc.
> dan(--nospam--at)willettengineering.com <mailto:dan(--nospam--at)willettengineering.com>
>