Return to index: [Subject] [Thread] [Date] [Author]

Steel shop drawing review & stamp

[Subject Prev][Subject Next][Thread Prev][Thread Next]
In Alaska a plan reviewer can insist that the EOR stamp the shop drawings, however, it would be illegal for the EOR to do so as the shop drawings were not done under his direct control and supervision.

James Allen, P.E.