RE: Lead time for steel JOISTS

[Subject Prev][Subject Next][Thread Prev][Thread Next]
In this case we're talking about maybe a dozen joists here. The only
"difficult" part is the three "SP" joists, which of course we can't detail
anyway.

We're not going to do the shop drawings, period. And I think this job is too
small to worry about "lead time".

My opinion.

-----Original Message-----
From: John Riley [mailto:jpriley485(--nospam--at)peoplepc.com]
Sent: Friday, March 03, 2000 9:32 AM
To: seaint(--nospam--at)seaint.org
Subject: Re: Lead time for steel JOISTS


In my experience, with steel joists the bottle neck is in the drafting
phase.  Evidently the manufacturers do not have the manpower to cover the
peaks.  If you do the shop drawings yourself, which isn't difficult, you can
dramatically affect the delivery time.

John P. Riley
Riley Engineering
Blue Grass, Iowa
----- Original Message -----
From: Polhemus, Bill <wlpolhemus(--nospam--at)sbinfra.com>
To: <seaint(--nospam--at)seaint.org>
Sent: Friday, March 03, 2000 8:51 AM
Subject: RE: Lead time for steel JOISTS


This brings up another question.

We just had a contractor inform us that a job that we put out to bid for a
private-sector client, which has some light roof joists in a small, single
story new building (the other, larger existing building is just interiors)
are "long lead items" and suggested that we change our design to show
CHANNELS for the roof support beams.

The joists I'm showing are like 12K3s, with 19'-0" spans.

How the heck is that a "long lead item" unless there's something I don't
know?

-----Original Message-----
From: Alan Howell [mailto:ahowell(--nospam--at)qualicosteel.com]
Sent: Friday, March 03, 2000 7:57 AM
To: seaint(--nospam--at)seaint.org
Subject: RE: Lead time for steel


In reply to Randy Diviney message:

Yes, there is still a major problem with the availability of most all
structural shapes, with no relief or end in sight.  At this point, shapes
that we mill order in March/April may not be available until June/July, and
that is not a certainty.  We have had to wait as long as five months for
shapes here recently.

Thanks,
Alan Howell
Project Manager
Qualico Steel Company, Inc.
P.O. Box 149
Webb, AL  36376
Phone 334-793-1290
Fax     334-702-1118
email  ahowell(--nospam--at)qualicosteel.com

I walked a mile with pleasure, She chattered all the way;
But none was I the wiser for all she had to say.

I walked a mile with sorrow; Not a word said she;
But, oh, the lessons she taught me as sorrow walked with me.