Return to index: [Subject] [Thread] [Date] [Author]

RE: Lead time for steel JOISTS

[Subject Prev][Subject Next][Thread Prev][Thread Next]
The requirement that shop drawings be prepared is typically (I believe) a Specification Stipulation not a UBC requirement.  You may want to inform the owner that he is paying to have shops prepared.  If shops are not prepared, you cannot be held responsible for the drawings being misinterpreted and that the owner is due compensation for these shops not being prepared (That is if the project was bid).