Return to index: [Subject] [Thread] [Date] [Author]

code soil values vs. site specific values

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Section 1805 describes when to use a soils engineer.
Footings with more than a continuous load of 2 k/ft or 50k at isolated
footings.
I have deisgned with and without soils reports.
Without, is mostly with the UMB provisions.