Return to index: [Subject] [Thread] [Date] [Author]

Pre-engineered Buildings Lead Time

[Subject Prev][Subject Next][Thread Prev][Thread Next]
I have two projects each of which involve construction of a pre-engineered
metal building. Both buildings have a rectangular footprint with double
pitched roofs and are ulitarian in appearance. The first building(project)
is 150'x50' with a 12' eave height. The second building(project) is 100'x70'
with a 25' eave height. Neither building has interior columns. For these two
types of structures, can anyone provide a guesstimate for the lead time(from
when the order is placed with the vendor to ready to ship materials)?  

TIA,
Charlie Canitz