Return to index: [Subject] [Thread] [Date] [Author]

Re: Pre-engineered Buildings Lead Time

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Charles, 
Where are the building located?  
Try WedgCor, Inc. they have a priority building program where certain lengths 
and widths area predesigned to sereral loading conditions.  They can ship in 
less than a month.   150x50 is a priority building.  100x70 is not probably 6 
weeks.

WedgCor, Inc.
Building Systems (701) 252-7380
p.o. box 110
Jamestown, ND 58402-0110

Jay Crawford, PE