Return to index: [Subject] [Thread] [Date] [Author]

Re: W8 Reinforcement

[Subject Prev][Subject Next][Thread Prev][Thread Next]
How about using a HSS 10 x 4 x .375 turned flat as a "cap" on the top
flange, welded as required to get composite behavior?

Mark D. Anderson
----- Original Message -----
From: "Michael Zaitz" <mzaitz(--nospam--at)hgbd.com>
To: "Structural Engineers Association" <seaint(--nospam--at)seaint.org>
Sent: Thursday, March 22, 2001 12:21 PM
Subject: W8 Reinforcement


> Hello all;
>
> I have a W8 x 24 that is intended to carry a 10" water line for fire
> protection.  The problem is the beam is spanning 60 feet!  After hearing
> this from the contractor I told him there was no chance that the beam
> would work (he called me as the Fire Protection contractor was about to
> start hanging the pipe).  What I am trying to do is determine how it can
> be reinforced (not necessarily in place) to support the load.  The
> building is a Metal Building and the top flange of the beam will not be
> braced.  Any ideas?
>
> TIA
>
> Mike
>
>
>
>