doubts in Pre-engineered metal building design

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Hi every one
I have some doubts regarding pre enginnered metal building design.

1.All the joints of the leantos connected to main frames are pinned and the
main frame will take care of moments.is this ok in stability point of view.

2.soldier columns are provided when the c/c of frames exceeds more then 40
feet in order to break the girt span.this soldier column base is pinned.is
this ok

will you please clarify the above points.

regards

s.selvaprakash

-----Original Message-----
From: george simmon [mailto:georgesimmon(--nospam--at)yahoo.com]
Sent: Saturday, May 12, 2001 12:47 AM
To: seaint(--nospam--at)seaint.org
Subject: Pre-engineered Bldg Foundation


Hi Everyone!
I read with interest the discussion/advice on
"Pre-engineered Metal Buildings" particulary because I
am designing foundations for such a building.  This
building with a bridge crane produces an outward
thrust of approx. 75 kips.  "Hairpin" is not
recommended to counteract this large outward kick.  I
am told "tie rods" connecting opposite column bases of
the rigid frame would be much preferable.  Now, I have
seen this detail somewhere, including an angle located
just below the column base plate with the anchor bolts
threading thru holes in the angle.  I can't locate
that source now.  I understand "Butler" has a
"Foundation Design and Construction Manual" which
provides some guidance.
Here are my questions:
1.  Has anybody seen this reference?  or, any other
reference which will provide design guidance.
2.  How do you design this angle connection  -  do you
design as a simply supported beam, with concentrated
loads from two AB's and tie-rods acting as supports?
Seems like I will need several tie-rods at each
column.
3.  What kind of pre-tension do I need to specify in
the tie-rods?  Would a 10% pre-tension of the
allowable capacity of the tie rods be adequate?
4.  I assume turn-buckles in the tie-rods would be
used for this purpose.  How do we measure the
pre-tension?
5.  Would you locate the tie rods within the slab or
below the slab?

Thanks for your precious guidance/advice to keep me
out of trouble.




__________________________________________________
Do You Yahoo!?
Yahoo! Auctions - buy the things you want at great prices
http://auctions.yahoo.com/

*
*   This email was sent to you via Structural Engineers
*   Association of Southern California (SEAOSC) server. To
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
*   send to the list is public domain and may be re-posted
*   without your permission. Make sure you visit our web
*   site at: http://www.seaint.org


* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org