Steel lintel beam

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Because the roof framing provides lateral bracing for the lintel, I intended
to suggest that a note be placed on the plan, such as "roof joists and deck
must be fully installed prior to applying masonry to lintel."

But then I got to thinking, the roof joists and (partial) deck are load to
the lintel prior to the diaphragm being fully installed.  Is it necessary to
dictate temporary bracing?
__________________
John P. Riley, PE, SE
Riley Engineering
20 Oakwood Drive, Blue Grass, Iowa 52726
Tel & Fax:  319-381-3949
jpriley485(--nospam--at)peoplepc.com


* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org