Stan Caldwell wrote

	
	"The Hyatt disaster also had nothing to do with the lack of
calculation submittals.  It was primarily the result of very poor project
communications, particularly regarding the shop drawing review and change
order request processes.  The EOR presented his perspective on this to SEAoT
earlier this year."

	Actually the Hyatt disaster is a great example of how plan check
could have possibly averted the disaster. The failure occurred when the
fabricator decided to revise the tie rod connection to the tube steel beams
that supported the walkway, on his own, and it apparently didn't catch the
eyes of anyone in Jack Gillum's (EOR) office. Let's assume this would occur
somewhere on the west coast where you have a semi-decent building department
with competent inspectors and plan checkers. The inspector would immediately
send the contractor downtown to get the revised detail approved by the plan
checker. This has been the protocol in all the California jurisdictions that
I have worked at. Heck, we sometimes get people back in the office who have
changed the raised floor framing to a slab on grade on a single family
dwelling! A revision of the magnitude that occurred at Hyatt most likely
would have had to go through the plan checker.

	Another good example of the role plan check can play is the Cal Sate
Northridge Parking garage. The huge garage utilized precast concrete moment
frames on the perimeter for the resisting lateral loads with no interior
lateral force resisting elements. The plan checker on the project raised
serious concerns during the review and would not approve the project. (all
of this is documented in a great article published after Northridge
earthquake in the LA Times) Eventually his boss (the manager of the plan
check firm hired by the Cal State Northridge) under pressure form the
university, approved the plans himself. Everyone knows what happened to that
building. We are lucky the quake happened at 5:00 when there was nobody in
the building.

	Also, I am amazed that someone who apparently is so sure of his work
and his track record (by the tread of emails I have read from Stan) would
object to a second set of eyes looking at his work. I personally would
welcome such a check and balance. None of us are that good that we can claim
we never make mistakes and are the ultimate authority on what we do.

	Ben Yousefi, SE
	San Jose, CA




* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org