Re: Shoring Responsibility

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Fountain;

The project is the standard design-BID-build.  Contractor was not chosen until
bids were in and the lowest (or closest thereto) was chosen.  The contractor
has not hired us to do the shoring design but claims that we are responsible
to give him loads and locations so he can design the shoring.  I personally do
not have much experience with this.

Thanks,

Mike



Fountain Conner wrote:

> You don't have control over the contractor's operations.  If you *dictate*
> the shoring design, it opens the owner up for extras.
>
> I will design the contractor's shoring, but he has to hire me to do it.  I
> will coordinate with him on the method he would like to use, and we will
> agree on an acceptable design.
>
> You *did* say design-build.  If you're working for the contractor in a
> direct-bill basis, I'd say it's okay, but you still need to coordinate
> closely with him.  If you're hard-money, it's a contractor function -- He
> has to pay someone to design the shoring, in either case.
>
> Fountain E. Conner, P.E.
> Gulf Breeze, Fl. 32561
>
> ----------
> > From: Michael Zaitz <mzaitz(--nospam--at)hgbd.com>
> > To: Structural Engineers Association <seaint(--nospam--at)seaint.org>
> > Subject: Shoring Responsibility
> > Date: Tuesday, June 19, 2001 6:53 AM
> >
> > Morning all;
> >
> > What is the responsibility of the engineer and the contractor for
> > shoring (design-bid-build job).  I have a school that we are removing an
> > existing loadbearing wall.  Bar joists currently bear on the wall and
> > the wall will be replaced with a post and beam system.  The issue of the
> > shoring has come up and we are trying to decide if that is the
> > contractors responsibility, our responsibility or both.  As I do not
> > know the contractors method for installation and other important items I
> > would say that how he shores it is up to him.  The contractor has
> > indicated that it is our responsibility to provide him with locations
> > and the loads (I did not have this conversation with him, another
> > engineer in our office did) and then he will design the shoring.  Is
> > this correct?  I have never heard of this before (only been in this
> > business for 7 years).  I have done shoring but only when directly hired
> > by the contractor.  Anytime it is part of a bid job we say to shore the
> > structure.  Anyplace that I can find more out about this?
> >
> > Mike
>
> *
> *   This email was sent to you via Structural Engineers
> *   Association of Southern California (SEAOSC) server. To
> *   subscribe (no fee) or UnSubscribe, please go to:
> *
> *   http://www.seaint.org/sealist1.asp
> *
> *   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
> *   send to the list is public domain and may be re-posted
> *   without your permission. Make sure you visit our web
> *   site at: http://www.seaint.org


* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org