I am designing a large concrete industrial structure. The soils report
states that settlement during the construction phase will be 2 to 2 1/4" and
an additional 1" long term. I am considering using a combination mat and
strip footings. I am a little worried about differential settlement. For the
long term it is acceptable (assuming 75% of 1") but how much do I have to
worry about the differential settlement during the construction phase?
Thanks in advance for all answers.

John Holliday P.E.


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********