RE: FEMA Welding Requirements

[Subject Prev][Subject Next][Thread Prev][Thread Next]
The requirements for continuous inspection of moment frames have been in the
code long before FEMA entered the picture. Whether continuous special
inspection is required for a shop weld is dependent on the jurisdiction
policy. Some, such as cities of LA and San Diego, have approved fabricators.
Therefore, for welds done in those shops a certificate of cont. special
insp. is not required. Some cities do not have approved fabricator list. For
those jurisdictions all welds requiring special inspection should have a
deputy observing the testing whether done in the field or shop.

Ben Yousefi, SE
San Jose, CA

	-----Original Message-----
	From:	FSRahbar(--nospam--at)aol.com [SMTP:FSRahbar(--nospam--at)aol.com]
	Sent:	Thursday, December 06, 2001 2:14 PM
	To:	seaint(--nospam--at)seaint.org
	Subject:	Re: FEMA Welding Requirements

	Does anyone know if FEMA requires Continuous Inspection on all Full
Penetration Welds done in a Fabricator Shop, even if the shop is Licensed by
the County or the City?
	
	FS Rahbar, SE

******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********