Return to index: [Subject] [Thread] [Date] [Author]

RE: Structural II Exam

[Subject Prev][Subject Next][Thread Prev][Thread Next]
I don't recall the NCEES Structural II having a mandatory bridge problem

 -----Original Message-----
From: 	Joseph R. Grill, PE [mailto:jgrill(--nospam--at)nelsonengineering.net]
Sent:	Friday, February 01, 2002 12:49 PM
To:	SEAINT
Subject:	Structural II Exam

I am scheduled to take the NCEES Structural II exam in April.  The NCEES
site shows the morning as one bridge and one building problem with a total
of two morning problems, and similar in the afternoon.  A short paragraph at
the bottom of the web page says the examinee is to work any one problem from
the two problems presented in each session.

Does the examinee do either one building or one bridge problem in the
morning and then in the afternoon, or two in the morning and two in the
afternoon?  In all my years my bridge experience is minimal and will require
a lot of study if bridge problems are mandatory.   Any help out there with
my confusion?

Joseph R. Grill, PE


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
*   This email was sent to you via Structural Engineers
*   Association of Southern California (SEAOSC) server. To
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
*   send to the list is public domain and may be re-posted
*   without your permission. Make sure you visit our web
*   site at: http://www.seaint.org
******* ****** ****** ****** ******* ****** ****** ********