Re: Repairing concrete metal deck.

[Subject Prev][Subject Next][Thread Prev][Thread Next]

Barry,

If all you need is to remove a couple of inches off the top you may want to look into hydroblasting then replace with a non-shrink mortar patch.

Thomas Hunt, S.E.
ABS Consulting



"Barry H. Welliver" <barrywelliver2(--nospam--at)earthlink.net>

08/30/2002 09:49 AM
Please respond to seaint

       
        To:        "Seaint Listserv" <seaint(--nospam--at)seaint.org>
        cc:        
        Subject:        Repairing concrete metal deck.



Opinions Wanted:, (some experience required/desired)
 
I have a project where plumbing was installed incorrectly in a concrete metal deck on steel joists. Because the concrete is the finish for the floor it is necessary to remove and re-pour an approximately 8'x8' section. The questions are is it possible to just cut the upper thickness of concrete, remove it, and re-pour (with appropriate doweling etc.) or should the entire pan be removed and replaced??
 
I suspect the concrete removal option may be difficult. Has anyone had experience with this?
 
Barry H. Welliver