Monolithic Concrete Pouring

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Can anybody please expound the meaning of "MONOLITHIC" concrete pouring?

We have a mat foundation of a 3-legged communication tower to be concrete poured. We plan to pour concrete on the mat footing first (60 cu.m.) then the pedestals ( 3.5 cu.m./pedestal) only after the footing had set for about 24 hours. But the client's inspector, in order to squeeze the construction schedule, insisted to have the foundation "monolithically" poured (i.e. concrete pouring of the footing and pedestal all at the same time without consideration of the initial setting). We argued that  this is not the standard practice in construction. Are we missing something here?

Thanks in advance for the help.

************************************************ 
Dennis S. Del Villar 
NESIC Philippines, Inc. 
Tel Nos: 063-2-891-41-67/87, loc.176 
Fax No: 063-2-891-41-61 
E-mail : < <mailto:ddelvillar(--nospam--at)nesic.com.ph>> 
************************************************ 
  



******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
*   This email was sent to you via Structural Engineers
*   Association of Southern California (SEAOSC) server. To
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
*   send to the list is public domain and may be re-posted
*   without your permission. Make sure you visit our web
*   site at: http://www.seaint.org
******* ****** ****** ****** ******* ****** ****** ********