Hello:

 
I am planning on taking the SE exam in an year in  SOCAL and would like to have some input from people who are in the similar process:
1.  did u take any review courses
 
NO. I HEARD THEY ARE JUST WASTE OF MONEY/TIME. JUST LISTENING TO EXPERTS WILL NOT HELP YOU ANYTHING. YOU GOT TO GET YOUR HANDS DIRTY!
 
2.  which review books were the most useful - I am aware of the Chelapathi books.
 
I BOUGHT CHELAPATI BOKS, BUT NEVER HAD TIME TO OPEN THEM. THESE BOOKS ARE OUT DATED. YOU CAN STUDY THEM WELL BEFORE EXAM BUT NOT WEEKS BEFORE THE EXAM.
 
3.  did u buy all the reference books? - i want to slowly start buying some books/codes
 
BUY ALL THE CODE, PARTICULARLY CBC VOL2, ASD, LRFD, NDS. SEAOC MANUALS ARE MUST-HAVES. ALSO GET A CURRENT CMU DESIGN MANUAL AND BRYERS WOOD DESIGN BOOK.
 
4.  Any good website / web boards to get and exchange information?
 
NO, EXCEPT PROFESSIONAL ENGINEERING BOARD WEBSITE PROVIDES EXAM RELATED INFO.
 
5.  CODE: are the problems refereced from the CBC or the UBC?
 
FOR SOME QUESTIONS, CBC SPECIFEID BUT MOSTLY UBC.
 
if CA adopts the 2003 IBC then it when do u think the board will adopt this into the exam?
-
 
6.  does anyone have experiece with the board in trying to petition with the board to take the exam before the 3 year period from the PE registration?
 
YOU CAN COUNT FROM THE DAY YOU TOOK YOUR PE Exam. READ THE INSTRUCTIONS FROM THE BOARD.
 
GOOD LUCK!
 
You input will be much appreciated.
 
Hari
 
 
 
----- Original Message -----
Sent: Monday, October 28, 2002 1:32 PM
Subject: Re: SE Exam

Gerard:
Those last three problems were not bad just long in calc's.  I did not complete the wood or masonry entirelybecause that concrete problem was worth 210 points.  The other two were worth 220.  The detail drawings were worth 50% of the calc points. I read the question as the given loads were factored, but based on other peoples answers I should have multiplied the given loads by omega.  I had 11 # 11's at bott and 6 #11 at top from calc's . We were given a 24" wide beam.  I drew & called out 2 rows of 5 bars and 1 row of two bars.
Wrote that I should recheck 55" for d and the test ended with 5 seconds to spare.

I think we had a base plate design LRFD in the MC section of the test.

I started the brace frame problem up to finished sizing the TS8x8x.5 and realized that they were askinf for a special not ordinary...... recovered from that mistake.

Joe Venuti