Need a book? Engineering books recommendations...

Return to index: [Subject] [Thread] [Date] [Author]

Re: Grade for Equipment Seismic Design Force

[Subject Prev][Subject Next][Thread Prev][Thread Next]
Thanks, James.
 
The floors with equipment are above grade: at the 2nd and 3rd levels.  Grade is at variable elevations between first and 2nd levels.
 
Nels
 
Nels Roselund
Structural Engineer
South San Gabriel, CA
njineer(--nospam--at)att.net