Dennis:

First, keep in mind that my post was to point out requirements (at least
as I understand them) of the 2002 MSJC (masonry code), not my personal
opinion.  In my personal opinion, I would agree that they should not need
ties as they are non-structural/lightly loaded.

But, per the 2002 MSJC, _ALL_ columns must have ties if they have vertical
steel.  Now, Rich pointed out something on point...your "columns" don't
fall under the definition of columns in the MSJC, even though teh
definition of the column in the MSJC is a little less than clear.

In addition, it appears that Nels has pointed you to a useful section in
the UBC.

Keep in mind, as well, that the IBC (which references the MSJC) would have
some additional requirements.  I don't have my IBC with me (I am currently
at the MSJC meetings in Portland...typing this message durng the executive
committee meeting).  I did, however, pose your question to someone more
int he "know" than I and he pointed out that there is a "lightly loaded"
column provisions in the IBC that may allow teh elimination of ties that
the MSJC requires.  Also, there may be a fence "exception" in the IBC
similar to what is in the UBC.

HTH,

Scott
Ypsilanti, MI


On Sun, 16 Nov 2003, Dennis Wish wrote:

> Scott,
> Two issues:
> 1. The columns are non-structural
> 2. As I noted in another post, the engineer who brought this to my
> attention indicated that at least vertical OR horizontal steel was
> required and if vertical was required; it was his opinion that the
> horizontal ties were not required. Inasmuch as this is not brick, I
> can't see that the horizontal ties would be necessary in fully grouted
> cells spaced at 8" o.c. typically.
>
> Scott, considering this is your field of expertise, I accept your
> interpretation, but consider that this is a non-structural fence post
> and let me know if this changes your opinion or the opinion of the other
> engineer that believe that either vertical OR horizontal reinforcing
> needed to be provided. I am at a loss as I don't see the necessity of it
> due to the fact that it is in block and not brick and that all cells are
> fully grouted.
>
> Thanks
> Dennis
>
> -----Original Message-----
> From: Scott Maxwell [mailto:smaxwell(--nospam--at)engin.umich.edu]
> Sent: Sunday, November 16, 2003 3:16 AM
> To: seaint(--nospam--at)seaint.org
> Subject: Re: CMU Column Ties (horizontal)
>
> Dennis:
>
> I don't have my UBC with me, but I do have the 2002 MSJC (masonry code).
> Section 1.13.6.5 requires the use of ties (at least #3) in columns at no
> more than 8" OC for Seismic Design Catergories D, E, and F.  This would
> equate roughly to zone 3 or 4 in the UBC.  Presumably, the UBC has a
> simillar provision.
>
> In addition, section 2.1.6.5a requires that lateral ties enclose
> longituduinal reinforcement.  The ties must be at least #2 bars.
> Section
> 2.1.6.5b gives the spacing requirements.  Thus, it would seem to me that
> if you don't have vertical reinforcement then you don't need ties.
>
> HTH,
>
> Scott
> Ypsilanti, MI
>
>
> On Sat, 15 Nov 2003, Dennis Wish wrote:
>
> > I have a client who created 24" square columns 6'-0" tall that are
> > spaced at approximately 10'-0" on center and surround a pool. Wrought
> > Iron fencing will infill the area between the columns which seem to be
> > installed for looks only. A three foot wide gate will be placed
> between
> > two of the columns, but the gate will be supported upon its own
> > stanchion.
> >
> > The client used 4x4x16" CMU in creating the columns and installed #4
> > vertical rebar at each corner and at 8-inches around the grid. He did
> > not install any horizontal steel and the city inspector (this was done
> > without engineering) will not allow the cells to be grouted until an
> > engineer verifies that the horizontal steel is not needed.
> >
> > I'm not sure I understand what purpose the horizontal steel has in
> this
> > case where the blocks are overlapped and the vertical steel locks them
> > together. Also, this is not part of a structure as it is nothing more
> > than a fence post. However, if there is a requirement for horizontal
> > steel I need to know what section of the code I might be violating. I
> > went through the Masonry Handbook (Amhrein's (?)) but was not able to
> > find a reference for this. Also, this is not brick but concrete
> masonry
> > units and it is not tied to any structure but is self-standing.
> >
> >
> >
> > Can anyone help me determine what I should recommend? If this were are
> > masonry wall of a building, a retaining wall or such, I would install
> > the ties or horizontal steel without question. Here it poses a problem
> > for the contract who believes it will interfere with his mortar
> joints.
> > I don't think this would unless the block he is using locks which I
> > could not see from the photos he provided. I am waiting for a shot
> from
> > the top down to see if there would be room to install #3 ties.
> >
> >
> >
> > TIA
> >
> > Dennis S. Wish, PE
> >
> >
>
>
> ******* ****** ******* ******** ******* ******* ******* ***
> *   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
> *
> *   This email was sent to you via Structural Engineers
> *   Association of Southern California (SEAOSC) server. To
> *   subscribe (no fee) or UnSubscribe, please go to:
> *
> *   http://www.seaint.org/sealist1.asp
> *
> *   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
> *   send to the list is public domain and may be re-posted
> *   without your permission. Make sure you visit our web
> *   site at: http://www.seaint.org
> ******* ****** ****** ****** ******* ****** ****** ********
>
>
> ******* ****** ******* ******** ******* ******* ******* ***
> *   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
> *
> *   This email was sent to you via Structural Engineers
> *   Association of Southern California (SEAOSC) server. To
> *   subscribe (no fee) or UnSubscribe, please go to:
> *
> *   http://www.seaint.org/sealist1.asp
> *
> *   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
> *   send to the list is public domain and may be re-posted
> *   without your permission. Make sure you visit our web
> *   site at: http://www.seaint.org
> ******* ****** ****** ****** ******* ****** ****** ********
>


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********