I think you are asking for trouble if you detail or model it as a pin.
Unless you want to guarantee there is some sort of crack interface between
the bottom of the slab and the top of the column.  This is nearly impossible
if you have more than one story of column.  Traditionally, all of the
vertical bars in the column are developed into the slab at the top and the
foundation at the bottom.  Then the joint is checked for lateral drift
assuming it is not part of the frame.  You will need to calculate drift of
the lateral system and push the joint an equal distance.  There are
provisions for how to detail this joint in chapter 21 of ACI.  As for splice
locations, refer to the detailing requirements for elements that aren't part
of the lateral system.  The requirement are pretty well thought out in ACI.

HTH,
Jake Watson, P.E.
Salt Lake City, UT

-----Original Message-----
From: Hui LI [mailto:hli(--nospam--at)maengineering.com]
Sent: Tuesday, July 27, 2004 4:27 PM
To: seaint(--nospam--at)seaint.org
Subject: Questions about Slab/Column Connection and Detailing (incorrect
subject in my previous email)


Sorry to send this email again.

List members:

I am designing a condominium in seismic zone area. We are using only the
ShearWalls as Seismic/Wind resisting system and not the columns.

Questions are:

1)Should the Slab/Column connection be designed and detailed as a Pinned
connection without considering the moment transferred from slab?

2)The pinned connection will minimize the punching shear stress. But how to
detail the column/slab connection as pinned condition? some technical paper
mentions that closely spaced ties can be placed over a length equal to one
and one-half times the larger cross-sectional dimension of the column (#3 @
3 in.), Is this a common practice? Are there any other ways?

3)Are the columns to be designed/detailed per ACI 2002 Chapter 21,for
instance rebar splice at midheight of the column?

Your response is greatly appreciated.

Hui Li
Projection Engineer

******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
*   This email was sent to you via Structural Engineers
*   Association of Southern California (SEAOSC) server. To
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you
*   send to the list is public domain and may be re-posted
*   without your permission. Make sure you visit our web
*   site at: http://www.seaint.org
******* ****** ****** ****** ******* ****** ****** ********


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********