Bill,

Do the holes result in the wall having less than the required capacity?  If
not, I would fill them in some simple way: fill them with common bricks and
mortar; or, if appearance is important, with CMU face-shells set in mortar.
If the holes must be filled to restore strength, it probably will not be
practical to try to leave the fill in the same state of stress as the
adjacent masonry -- it will be unstressed when the fill is completed, while
the adjacent masonry will be carrying the load that was once in the
cut-outs.  If that's O.K., I'd probably fill the hole with brick and mortar,
and dry-pack mortar into the top bed joint on a subsequent day, after the
setting mortar had attained most of its shrinkage.  Or make the mortar with
Eisenwall Cement by CTS [8oo-929-3030 in Orange County CA]: it's a
shrinkage-compensated cement.  If appearance is important, I'd use an
H-shaped CMU, and inject a fine grout with Sika GroutAid to control
shrinkage, or make it with  Eisenwall Cement.

I'd avoid epoxy grout -- its messy, and it gets very hot in large masses,
and has a relatively low elastic modulus. 

Nels Roselund, SE
South San Gabriel, CA
njineer(--nospam--at)att.net

-----Original Message-----
From: Bill Allen, S.E. [mailto:T.W.Allen(--nospam--at)cox.net] 
Sent: Wednesday, January 19, 2005 2:59 PM
To: seaint(--nospam--at)seaint.org
Subject: Filling Holes in CMU

I've got a project where I have to have prism samples cut from existing CMU
walls.

These holes will be somewhere between 16" square to 8" wide x 16" high.

I'm looking for recommendations on what I should fill the hole with and any
material/procedural specific recommendations that can be made.

I'm thinking that it will require some sort of a bonding agent (Sika or ??)
and then the hole filled with a non-shrink epoxy grout in a hole formed by
plywood attached to the adjacent CMU and a fill tube at the top.

Maybe this isn't the right/best way to go. I would like to hear
alternatives.

Even if this is the right/best way to go, I would be interested in
recommendations for the bonding agent and epoxy grout.

The design F'm is 3,000 psi using high strength block (compressive strength
of 3,750 psi), 4,000 psi grout and 3,000 psi type M mortar.

For more info on the project, go to:
http://www.allendesigns.com/projects/20402/20402.htm

Thanks,

T. William (Bill) Allen, S.E. (CA #2607)	
ALLEN DESIGNS	
Consulting Structural Engineers	
http://www.AllenDesigns.com	
V (949) 248-8588	 .	 F (949) 209-2509	



******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ******** 



******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********