Should a seismic joint supposed to extend through the foundations between two buildings as well? 
 
For instance I have an existing building wall on a continuous turndown edge. I want to put the new wall 3" off of the existing.  At the foundation level, should this gap also exist between the existing and new footings or can the new foundation be poured directly up against the existing?
 
If a gap is required, I don't see this really being effective since dirt and other debris will fill the gap over time between the 2 buildings, if not by the end of construction.
 
 
Will


MSN Premium helps protect against viruses, hackers, junk e-mail & pop-ups. ******* ****** ******* ******** ******* ******* ******* *** * Read list FAQ at: http://www.seaint.org/list_FAQ.asp * * This email was sent to you via Structural Engineers * Association of Southern California (SEAOSC) server. To * subscribe (no fee) or UnSubscribe, please go to: * * http://www.seaint.org/sealist1.asp * * Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you * send to the list is public domain and may be re-posted * without your permission. Make sure you visit our web * site at: http://www.seaint.org ******* ****** ****** ****** ******* ****** ****** ********