RE: Converting ceiling joist to floor joist.

[Subject Prev][Subject Next][Thread Prev][Thread Next]

Table 18-1-C of the 1997 UBC prescribes the minimum requirements for number of floors [in addition to a roof] that may be supported on minimum size footings – unusual conditions excepted.  An existing foundation for a house built on a slab on grade supports only a roof – a floor may be added without modifying the foundation.

 

Nels Roselund, SE

South San Gabriel, CA

njineer(--nospam--at)att.net


From: hadiprawira djohan [mailto:hadiprawira(--nospam--at)yahoo.com]
Sent: Wednesday, September 21, 2005 8:10 PM
To: seaint(--nospam--at)seaint.org
Subject: Re: Converting ceiling joist to floor joist.

 

In my case, I have the ex. footing dug and verified the soil. If the footing is inadeaquate, i would suggest helical piles system.

I wonder if anyone else has any other ideas!

 

djohan.

Jnapd(--nospam--at)aol.com wrote:

Chuck:

 

How do you upgrade the footings on these structures ??

 

Joe Venuti
Johnson & Nielsen Associates
Palm Springs, CA