RE: Drilled Pier/pile-Support is pinned or fixed

[Subject Prev][Subject Next][Thread Prev][Thread Next]

Bob,

It’s a nice thing to know about reliable and easy pin connections. Where from I can get a copy of that final report which you mentioned?.

Thanks and regards

Ashraf

 


From: Robert Kazanjy [mailto:rkazanjy(--nospam--at)gmail.com]
Sent: 31 August 2006 02:06
To: seaint(--nospam--at)seaint.org
Subject: Re: Drilled Pier/pile-Support is pinned or fixed

 

Mohammed-

CalTrans (California Dept of Transpiration)  has details for pinned column bases.  I was part of a project in a structural research laboratory where we actually built 40% scale models (24" diameter) & tested them to failure.

My recollection was the detail was pretty simple and not at all that difficult to construct (we did it with grad student & undergrad labor).

CalTrans likes to keep all the damage above the footing so that damage can be spotted & repaired more easily.  The performance of the pinned joint was quite reliable as I recall.  Unfortunately I do not have a opy of the final report


cheers
Bob

On 8/30/06, Ashraf, Mohammed (Qatar) <mohammed.ashraf(--nospam--at)worleyparsons.com > wrote:

Dear Job,

Thanks Job and I know that's the best option. But in order avoid such a difficult detail of pin connection of concrete column /pile interface I am looking for other options.

Regards

Ashraf

 


From: Robert Kazanjy [mailto:rkazanjy(--nospam--at)gmail.com]
Sent: 30 August 2006 09:21
To: seaint(--nospam--at)seaint.org
Subject: Re: Drilled Pier/pile-Support is pinned or fixed

 

Why not just design a pin into the column / pile interface to control the forces the pile sees?

cheers
Bob

On 8/29/06, Ashraf, Mohammed (Qatar) <mohammed.ashraf(--nospam--at)worleyparsons.com> wrote:

Hello All,

I am designing a pile/drilled pier foundation for a building. I want to reduce the support forces so that I can reduce the no. of piles/pier. The columns are almost 20m high. I would like to know whether I can take base as pinned in analysis if I am using singe piles/piers for each column. The pile/drilled piers are around 6 to 10 m deep. The piles/piers here are designed based on skin friction with a pile socket length in rock of 3 to 6m. The rock is of poor quality with RQD (Rock Quality Designation) 0% to 50%. These are from Geotechnical report. I would like to mention that the soil up to 3 to 5m from Pile/Pier head is mainly of hydraulic fill material. N value of top soil varies from 35 to 4. The site is in a reclamation area.

Thanks in advance,

Regards

Ashraf

*** WORLEYPARSONS GROUP NOTICE ***

"This email is confidential.  If you are not the intended recipient, you must not disclose  or  use the  information contained in it.  If you have received this email in error,  please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."
 

 

*** WORLEYPARSONS GROUP NOTICE ***
"This email is confidential.  If you are not the intended recipient, you must not disclose  or  use the  information contained in it.  If you have received this email in error,  please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."
 

 

*** WORLEYPARSONS GROUP NOTICE ***
"This email is confidential.  If you are not the intended recipient, you must not disclose  or  use the  information contained in it.  If you have received this email in error,  please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."