You might inquire as to whether it was built the way you detailed it.

How big is the crack? How far above the floor? What kind of soils? Cantilever retaining or foundation wall?

 

Christopher Banbury, PE

President

Ark Engineering, Inc.

PO Box 10129, Brooksville, FL 34603

22 N. Broad ST, Brooksville, FL 34601

Phone: (352) 754-2424

FAX: (352) 754-2412

www.arkengineering.net

 


From: Mark L. Puccio [mailto:mpuccio(--nospam--at)mpsqrd.com]
Sent: Monday, March 19, 2007 1:01 PM
To: seaint(--nospam--at)seaint.org
Subject: Crack next to wall control joint

 

For exposed concrete walls – basement, retaining etc. we typically show control joints at 25ft or 30ft oc. Our detail shows the horizontal wall reinforcing stopping each side of the joint, the joint is to be notched one fourth the wall depth from each side of the wall with chamfered corners then filled with caulk. We also show smooth greased dowel rods in the center of the wall to try to maintain wall alignment.

 

Using this detail we have a project where we have a vertical crack about one foot or so from the CJ. Our client would like an explanation. Besides the possibility of the wall reinforcing not stopping at the joint or the concrete just not being as smart as it should be – can any of you provide any insight or into what might be going on? Does our detail sound like a typical detail you use or do you have any further suggestions?

 

Thanks

 

Mark L. Puccio P.E., S.E.