Need a book? Engineering books recommendations...

Return to index: [Subject] [Thread] [Date] [Author]

Pile cap plate to pile connection

[Subject Prev][Subject Next][Thread Prev][Thread Next]
I have a project under construction that was designed under the 2003 IBC. I am researching the required minimum weld for a pile cap connected to a driven steel pile. Is there a minimum requirement (70%) of pile capacity or some such ratio?

******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* * This email was sent to you via Structural Engineers * Association of Southern California (SEAOSC) server. To * subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
* Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you * send to the list is public domain and may be re-posted * without your permission. Make sure you visit our web * site at: http://www.seaint.org ******* ****** ****** ****** ******* ****** ****** ********