Deep Beams

[Subject Prev][Subject Next][Thread Prev][Thread Next]

ACI 318 section 11.7 describes a deep beam as any beam that is loaded within 2h of the end; and therefore Appendix A, strut-and-tie, is to be used. (Or a non-linear method)

So, that would mean that any beam with a moving load would have to be designed that way because the load will at some point be in that range.

Is there a minimum load for which the deep beam analysis becomes unnecessary?

 