Need a book? Engineering books recommendations...

Return to index: [Subject] [Thread] [Date] [Author]

Re: Concrete Mix Design

[Subject Prev][Subject Next][Thread Prev][Thread Next]
I believe DSA requires a PE stamp on mix designs.  Offhand, I don't know if CBC has the requirement.  It may  be a local requirement.  

On Tue, Jul 20, 2010 at 3:48 PM, <fsrahbar(--nospam--at)aol.com> wrote:
In California, could the concrete mix design be signed by just a technician or does it have to be signed by a PE when submitted to the EOR?
 
Thank you,

Farzin S. Rahbar, SE
Vice President
David C. Weiss Structural Engineer & Associates, Inc.
(818) 227-8040 Ex. 13 Fax: (818) 227-8041



--
David Topete, SE