RE: EOR & pre-engineered trusses

[Subject Prev][Subject Next][Thread Prev][Thread Next]
PAUL

We had talked last year about the possibility of

You giving a presentation on Pre-Engineered 

Buildings to the IStructE

Are you still on ?

If so we have two dates available

May 10th. or May 24th


Regards


Peter



Peter Sheffield & Associates Ltd.
Consulting Structural Engineers
124 Laird Dr. Suite 104 Toronto ON M4G 3V3
Tel: 416-486-0210


-----Original Message-----
From: ad026 rpransom [mailto:ad026(--nospam--at)rpransom.ca] 
Sent: Saturday, March 19, 2011 12:20 PM
To: seaint(--nospam--at)seaint.org
Subject: Re: EOR & pre-engineered trusses

<CRINGE>

Mark,
Have you ever written a letter to your client advising them of the
consequences of inappropriate truss design/installation and that it could
not be confirmed since the supplier did not make the --> mandatory <--
submissions? Further: if the design and installation is not consistent with
your design expectations that you cannot accept liability resulting from
damages or failure. This tends to make paper arrive very quickly.

You may wish to discuss this with your insurer since you may have left
yourself open to unintended liability.

Regards
Paul
-- 
Paul Ransom, P.Eng.
ad026(--nospam--at)RPRansom.ca



> From: "Mark(--nospam--at)Crownjade.com" <mark(--nospam--at)crownjade.com>

> I typically list on the roof framing plan the snow load so there is no =
> question. I also require in my structural notes that I need to review =
> the truss plan from the supplier with this note: SUBMIT 3 COPIES OF SHOP =
> DRAWINGS AND STRUCTURAL CALCULATIONS TO MARK BENJAMIN P.E., FOR REVIEW 7 =
> DAYS PRIOR TO FABRICATION (APPROVAL PRIOR TO FABRICATION IS NOT =
> REQUIRED). I have only gotten 3 truss plans in 6 years. The upshot to =
> this is that if I assumed a particular girder truss location (I place =
> those on my framing plan) and it is different and creates a problem, =
> then I am in the clear if I am not provided the truss plans. My =
> structural notes list the truss requirements. I have never had a =
> building department require my stamp or construction observation for =
> engineered trusses.
> 
> =20
> 
> Thank You, Mark Benjamin
> 
> Crown Jade Design and Engineering, Inc.


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ******** 


******* ****** ******* ******** ******* ******* ******* ***
*   Read list FAQ at: http://www.seaint.org/list_FAQ.asp
* 
*   This email was sent to you via Structural Engineers 
*   Association of Southern California (SEAOSC) server. To 
*   subscribe (no fee) or UnSubscribe, please go to:
*
*   http://www.seaint.org/sealist1.asp
*
*   Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you 
*   send to the list is public domain and may be re-posted 
*   without your permission. Make sure you visit our web 
*   site at: http://www.seaint.org 
******* ****** ****** ****** ******* ****** ****** ********